GJR5250900R0202 07DI90-S
【厦门兴锐嘉进出口有限公司】特惠供应
建质量效益之路,创质量效益之业,兴锐嘉期待与您的合作!
Based don high quality and mutual benefit,Xingruijia looks forward to cooperating with you!
一个品牌,一个故事,一种 PLC 卡件,一段经历!
厦门兴锐嘉,让生活的感觉更美好!值得您一生拥有!
你的满意是我们不懈的追求;
你的口碑相传是对我们好的回报;
我们赚合理利润,做长久生意,交真心朋友;
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
=====================================
it is automatically switched to the 2 # standby line, and the 1 # main line is automatically switched back when it is restored, the power supply will have a short 3s interruption, the inverter is the equipment, will be in 0.5 s because the power supply lacks the phase to stop immediately, the inverter failure protection, causes a water cut off; when the artificial recovery inverter failure, 2 # standby line is running, 1 # main input line voltage recovery, and automatically switch back to the 1 # main line, switching process, and will cause a short-term power supply interruption, resulting in secondary water cut off. It can be seen that the double-circuit power supply of automatic switching power supply is also an important hidden danger of unstable water supply. Transformation target the transformation of the control mode of the system relates to the production of the whole plant. If it is simply pulled down and redone, it will surely result in the waste of the original equipment. The reconstruction of the system is not only over-invested, but also related to long-term water suspension, caused the factory to stop production, the loss is huge. In view of the above problem, this transformation localization is not stops the water to upgrade the stability transformation. Specific requirements: the renovation process can not stop water, the original equipment as far as possible, only do the key, node, bottleneck transformation, and strive to make small investment, quick effect, high stability. After on-site investigation and technical analysis, the following reform schemes are established: Centralized Monitoring, independent decentralized control, emergency power supply and water supply. Two independent control transformation and two centralized monitoring modification: Two independent control transformation is divided into emergency power supply water supply and inverter independent control transformation; two centralized monitoring is divided into PLC and configuration centralized monitoring program modification and improvement.
====================================
思绪翻飞,月光从指间流逝,眼前一地斑斓。掬一捧月光,溶成我淡淡的微笑,冲淡我浓浓的感伤。让扁舟搁浅于黄昏的渡口,在青石栈淋漓尽致地演奏一首无尘之曲,让雾霭中回荡着一种空灵。时间静止,画面定格,封存记忆。我仍然独舞!
====================================
GJR5250900R0202 07DI90-S
ABB
3BHB003154R0101
ABB
3BHB003387R0101
ABB
3BHB003431R0001
ABB
3BHB003688R0001
ABB
3BHB004692R0001
ABB
3BHB004692R001
ABB
3BHB004693R0001
ABB
3BHB005171R0101
ABB
3BHB005243R0105/KU C755 AE105
ABB
3BHB006414R0001
ABB
3BHB006621R0103
ABB
3BHB006621R0103/UA C375 AE103
ABB
3BHB007209R0102
ABB
3BHB007209R0102/XV C767 AE102
ABB
3BHB007211R0101
ABB
3BHB007211R0101/XV C768 AE101
ABB
3BHB007211R0102/XVC768
ABB
3BHB007211R0105
ABB
3BHB007211R0105/XV C768 AE105
ABB
3BHB013088R0001
ABB
3BHB017688R0001
ABB
3BHB017688R001
ABB
3BHB019719R0101
ABB
3BHE003688R0101
ABB
3BHE004573R0141
ABB
3BHE004573R0142
ABB
3BHE004573R0143
ABB
3BHE004573R0145
ABB
3BHE005555R0101
ABB
3BHE005555R0101 LD SYN-101
ABB
3BHE005555R0101 LDSYN-101
ABB
3BHE005555R0101/LD SYN-101
ABB
3BHE006373R0101
ABB
3BHE006373R0101/XV C769 AE101
ABB
3BHE006412R0101
ABB
3BHE006412R0101/UF C762 AE101
ABB
3BHE006414R0001/XV C770 AE
ABB
3BHE009017R0101
ABB
3BHE009017R0101/XV C724 BE101
ABB
3BHE009681R0101
ABB
3BHE010751R0101 PP C902 AE101
ABB
3BHE013940R0002
ABB
3BHE014070R0101
ABB
3BHE014070R0101/PP C905 AE101
ABB
3BHE014070R0101/PPC905
ABB
3BHE021083R0101
ABB
3BHE021083R0101/XV C770 BE101
ABB
3BHE024415R0101
ABB
3BHE024577R0101
ABB
3BHE024577R0101/PP C907
ABB
3BHE024855R0101
ABB
3BHE024855R0101 ABB
ABB
3BHL000389P0104
ABB
3BHL000397P0001
ABB
3BHL000986P7000
ABB
3BHL001863P0001
GJR5250900R0202 07DI90-S由【厦门兴锐嘉进出口有限公司】优惠供应.